Petmol milk production factory

Project Name General contractor for 20000 sq m milk production facility. Audit, design, installation, delivery, commissioning for power supply, lighting, UPS and structured cabling systems.
Year 2007-2009
The scope of work

Audit, design, delivery and setup of power supply, lighting, UPS and structured cabling system.

Design and turn-key delivery: 0.4kV switchgear; Distribution subsystems (boards), installation of outlets, circuit breakers. etc;